EATME
Exponentially Weighted Moving Average with Adjustments to Measurement Error
The univariate statistical quality control tool aims to address measurement error effects when constructing exponentially weighted moving average p control charts. The method primarily focuses on binary random variables, but it can be applied to any continuous random variables by using sign statistic to transform them to discrete ones. With the correction of measurement error effects, we can obtain the corrected control limits of exponentially weighted moving average p control chart and reasonably adjusted exponentially weighted moving average p control charts. The methods in this package can be found in some relevant references, such as Chen and Yang (2022)
- Version0.1.0
- R versionunknown
- LicenseGPL-3
- Needs compilation?No
- Last release05/17/2022
Documentation
Team
Cheng-Kuan Lin Developer
Li-Pang Chen
Show author detailsRolesAuthorSu-Fen Yang
Show author detailsRolesAuthor
Insights
Last 30 days
Last 365 days
The following line graph shows the downloads per day. You can hover over the graph to see the exact number of downloads per day.
Data provided by CRAN
Binaries
Dependencies
- Imports1 package
- Suggests2 packages