changeS

S-Curve Fit for Changepoint Analysis

CRAN Package

Estimation of changepoints using an "S-curve" approximation. Formation of confidence intervals for changepoint locations and magnitudes. Both abrupt and gradual changes can be modeled.


Documentation


Team


Insights

Last 30 days

Last 365 days

The following line graph shows the downloads per day. You can hover over the graph to see the exact number of downloads per day.

Data provided by CRAN


Binaries


Dependencies

  • Depends4 packages
  • Suggests2 packages