jointPm

Risk Estimation Using the Joint Probability Method

CRAN Package

Estimate risk caused by two extreme and dependent forcing variables using bivariate extreme value models as described in Zheng, Westra, and Sisson (2013) doi:10.1016/j.jhydrol.2013.09.054; Zheng, Westra and Leonard (2014) doi:10.1002/2013WR014616; Zheng, Leonard and Westra (2015) doi:10.2166/hydro.2015.052.


Team


Insights

Last 30 days

Last 365 days

The following line graph shows the downloads per day. You can hover over the graph to see the exact number of downloads per day.

Data provided by CRAN


Binaries