jointPm
Risk Estimation Using the Joint Probability Method
Estimate risk caused by two extreme and dependent forcing variables using bivariate extreme value models as described in Zheng, Westra, and Sisson (2013) doi:10.1016/j.jhydrol.2013.09.054; Zheng, Westra and Leonard (2014) doi:10.1002/2013WR014616; Zheng, Leonard and Westra (2015) doi:10.2166/hydro.2015.052.
- Version2.3.2
- R versionunknown
- LicenseGPL-2
- LicenseGPL-3
- Needs compilation?No
- Last release04/22/2023
Team
Leo Belzile
Feifei Zheng
Show author detailsRolesAuthorSeth Westra
Show author detailsRolesAuthorMichael Leonard
Insights
Last 30 days
This package has been downloaded 565 times in the last 30 days. This could be a paper that people cite without reading. Reaching the medium popularity echelon is no small feat! The following heatmap shows the distribution of downloads per day. Yesterday, it was downloaded 7 times.
The following line graph shows the downloads per day. You can hover over the graph to see the exact number of downloads per day.
Last 365 days
This package has been downloaded 7,599 times in the last 365 days. A solid achievement! Enough downloads to get noticed at department meetings. The day with the most downloads was Apr 12, 2025 with 74 downloads.
The following line graph shows the downloads per day. You can hover over the graph to see the exact number of downloads per day.
Data provided by CRAN